Fall/Early Winter 2010 Workday Schedule


September is here already and so is the workday season. With a mix of maintenance, and new trail construction there's a lot to be done, so mark your calendar. More information on each workday can be found here as the date approaches.

Sept 18 Creve Coeur Park
Sept 25 Greensfelder Park

Oct 2 Lost Valley
Oct 16 Chubb
Oct 17 North Trace Sawyer Run
Oct 30 Cliff Cave | Appreciation Party

Nov 6 Greensfelder Park
Nov 13 SIUE (Southern Illinois University – Edwardsville)
Nov 20 Rock Hollow

Dec 4 Matson Hill Park
Dec 11 Matson Hill Park

Time Lapse on the Continental Divide


In this case the time lapse is 5 years, which is the difference between when these two photos were taken. The one on the top is from the top of Paywell Mtn. It was taken a few weeks ago, and it's looking north toward the western portal of the Alpine Tunnel.
The lower photo is looking south at Paywell Mtn. taken in 2005 from above the Alpine Tunnel, which sits squarely on the Continental Divide. You can see the turntable where the locomotives were turned around in the lower right. If you look really close, you can see Durango Doug standing right next to the turntable. I can't tell if he has his shirt on.

Matson map updated


Well, it was a little slow in arriving, but the map of the new trail at Matson Hill is finally here! The best thing to report is the current distance of 4.9 miles, up from 2.8. There's a lot more to come, and Matson has 2 workdays scheduled for this year, so come out and help add even more trail. The pdf version of the map should be up on the GORC Trails page soon, and you will be able to find it here.

Withered and melted on MiddleFork

I managed to convince a few foolhardy souls to make an attempt at an out-n-back of Middlefork on the 19th of July. The heat seemed like it might become an issue (heat indices well into the 100's F) but some extra measures were taken by the group to stave off instant death by dehydration or melting: electrolyte tabs, a water filter for refilling bottles and bladders, and I personally went for the full-on, double CamelBak maneuver...

The trail was in pretty good shape and its signature sustained benchcut downhills were as awesome as always. There was quite a bit of thorny veg to force your way through which made for some bloody raw arms and legs.

We hit Barton Fen and took a break... I think my tires were starting to smolder anyway. After refilling some bottles and plotting our next move, the smart guy in the group suggested perhaps a little turn-around-and-start-backing might be in order for safety's sake... because it was unbelievably hot and all. I'm not naming names, but his name starts with "C" and ends with "-raig"... And I'd probably be a dessicated pile of withered, leathery flesh on the side of the trail if I hadn't listened to his good sense.

Summary of Spring 2010 Work

"Car Door Loop" at Matson
More new singletrack at Matson

Another busy Spring. Our trail mileage was down due to the number of workdays that had to be devoted to maintenance. Next time you're out in marginal conditions trying to decide whether or not to ride, please remember that these maintenance days take away from building new trail. Here's a brief summary which lists the trail name, what type of work was done, the number of workdays, and the mileage of the sections worked on:




Cliff Cave - New Construction/Reroutes 1.5 workdays  0.5 miles
Matson Hill - New Construction/Reroutes 4 workdays 1.50 miles
SIUE - Maintenance/Reroutes 1 workday 0.10 miles
Castlewood - New Construction/Reroutes 2 workdays 0.40 miles
Chubb - Maintenance/Reroutes No official workdays 0.10 miles
Greensfelder - New Construction/Reroutes 2 workdays 1.0 miles
Creve Coeur - New Construction 2 workdays 1.0 miles

Matson Hill - June 5th Workday 9-1pm



When:
Saturday, June 5th, 2010. From 9:00~1:00.

What: We're having the last of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain bikers, hikers, and trail runners are all welcome, so don’t be bashful about showing up.

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Where:

From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
• Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through pilznr’s “What to expect at a workday” post, available via this link; http://gorctrails.com/board/topic.asp?TOPIC_ID=3711

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):
• The St. Charles County Park's (SCCP) office [636-949-7535],
• through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/
• or on this thread.

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.

Bring your bike or trail shoes if you want to try what you built after lunch.

NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.

Monthly Meeting for June- Canceled

The regular monthly meeting scheduled for June 2nd has been canceled. See you on July 7th.

Police Chaser


From May 1-8 the International Police Mountain Bike Association held their annual conference in Chesterfield. Part of their training involved getting some off-road saddle time at nearby Castlewood state park. GORC supplied some volunteer trail guides to help direct the IPMBA participants to trails appropriate for their skill level and, of course, to keep them from getting lost... or arrested or something.

In the above photo Craig Seibert demonstrates how to use your focused chi energy to snap standard police issue handcuffs.

Mike Dunston found and posted this STLToday vid to the GORC forum...
...there aren't any GORCsters in the vid but it's got skid stops and gunfire.

Besides Seibert, the other GORC helpers were Ryan Overhoff, Fred Williams, Greg Suter, Charles Wells, Scott Nelson and maybe one other dude. GORC chieftain Bryan Adams posted this appreciation letter he received on the forum...

I tried to limit myself to just a few doughnut jokes in an effort to not besmirch the club's good name... and not get shot.

The bulk of my other photos from the event are largely based around the incredulity of a horse trailer jammed full of bikes.

Clif Bar Grant Purchase In Action


Last year we received a $500 grant from Clif Bar to purchase a Stihl Yard Boss. I'd seen Glenn using it at workdays at Lost Valley, Creve Coeur and Greensfelder, but those were all on relatively small sections.
Here, we took it out to the Dogwood trail, and used it to remove a large berm that was causing water to be channeled straight down the trail.
This section was about 60' long, and Glenn ripped through it in a little over an hour. It probably would have taken the two of us most of the day to do it by hand. In these pictures, he's around half-way done, and you can see the height of the berm next to the mud. The Yard Boss is a pretty slick little machine, and we're planning to use it even more to help with maintenance and trail building.

Ticked Off




Last year, after one of our members came down with erlichiosis from an encounter with some ticks on the Ozark Trail, I decided to find out some more information about ticks and the consequences of their bites. Luckily for us, we have a tick expert right here in Missouri, who also happens to be a mountain biker- Dr. Greg Cummins, who is a member of Earthriders out in Kansas City, and the author of the Tick-Borne Diseases section of Wilderness Medicine, which is kind of the bible for outdoor medical care. I contacted Greg and had a discussion with him about ticks and the local environment. Fortunately for me, he also mentioned that he would be working on a paper after many years of threatening to do so. So, I managed to win the battle of procrastination, and Greg has kindly allowed us to republish an article that originally appeared on the Earthriders website. He asked me to point out that while the article was written for the KC area, everything in it also applies to the STL as well. I've lightly edited out a few things that didn't really relate to mountain biking.

Despite our nicely groomed and well maintained trails, ticks are abundant at all trails, especially those around the Kansas City metro area. Tick-borne diseases affect everyone, not just those involved in outdoor activities. Building and maintaining trails especially exposes trail workers, as we are working directly in the leaf litter, where the ticks are found. Activities such as walking, working in the yard, sitting out on the patio, in addition to true outdoor sports expose you to ticks and the diseases they carry. Tick-borne diseases are common among us bikers, but are even seen in people who seldom or never go outdoors. They are much more prevalent in those who do spend a lot of time outdoors. Certain tick-borne diseases are five times more likely in pet owners, as they participate in activities more likely to expose the pet owners, and due to pets coming in and out of the residence. This may expose pet and homeowners to tick-borne diseases without actually encountering the outdoors. Ticks are generally non-preferential in regards to a host. In other words, they will get a blood meal wherever they can. Basically, they are not selective, and they suck.

Tick-borne diseases have increased significantly over the past 20 years, for various reasons, from increased suburbanization, increased reservoir host populations (such as deer, raccoons, opossums, coyotes, and numerous others--not to mention the all elusive bobcat or mountain lion), and the increase of people participating in outdoor activities and pet ownership. Additionally, there has been an extension of the warmer seasons, and overall change in weather patterns—call it global warming or climate change, whatever you want, it is indeed happening. Deer populations have increased 60 fold in the past 100 years due to decreased natural predators. Each deer can carry over 3000 ticks. Each female tick may lay over 3000 eggs. Deer are thus a significant contributor to tick populations. Combine these statistics with the increased suburbanization, and Houston, we have a problem.

Tick-borne diseases are often very hard to diagnose. They frequently mimic nonspecific summer flu or viral symptoms, such as general lack of energy, fatigue, headache, fevers, chills, body aches, dry cough, nausea and other gastrointestinal symptoms, among many other vague symptoms. If you experience any of these symptoms, with or without a rash, and with or without a confirmed tick bite, during warmer months (can occur any time of year, but typically March through November), go see your doctor. Doctors are becoming more aware of tick-borne diseases and can treat you and test for these diseases. Basic lab tests which are returned very quickly will indicate specific abnormalities consistent with some tick-borne diseases. Specific immunological tests for most of these diseases are available, though are often inaccurate and take some time to get results. If your doctor is really suspicious for a tick-borne disease, you should start antibiotics immediately.

The main tick-borne diseases to be aware of in this area include (in order of prevalence), with referral websites to CDC links for more information:

Ehrlichiosis (and anaplasmosis), also called the “spotless spotted fevers”—transmitted by 2-3 tick species, is the most common tick-borne disease found in this area. This disease is much like Rocky Mountain Spotted Fever (RMSF), and manifests with high grade fevers, and the above symptoms. The fevers in Ehrlichiosis are often in the 102-104 degrees Fahrenheit range. Twenty percent of adults may have a fine diffuse rash (meaning 80% DON’T have a rash), and up to 40% of children may have the rash. The incubation period for Ehrlichiosis is 3 days to 3 weeks, with a median incubation period of about 7 days. Ticks that transmit Ehrlichiosis typically need to be attached (feeding on you) 24-48 hours to transmit this disease. Untreated, Ehrlichiosis carries a 5% mortality rate, while 30-40% of patients will require hospitalization, so if you ride/work/run/walk on trails around here, see a doctor if you have any of the above symptoms. For more information go to http://www.cdc.gov/ticks/diseases/ehrlichiosis/ and http://www.cdc.gov/ticks/diseases/anaplasmosis/faq.html

Rocky Mountain spotted fever (RMSF) is very similar to Ehrlichiosis in signs and symptoms. The name is a misnomer, as >85% of the cases are from states east of the Rocky Mountains. We do see some around the KC metro area, though far less than Ehrlichiosis. It is also called “black measles” due to the black pimple/crater-like formations often seen. Typically also high grade fevers, >102 degrees Fahrenheit. RMSF is transmitted by various tick species. The incubation period, from time of tick attachment to disease manifestation is 2 days to 2 weeks. The ticks that transmit this disease only need to be attached (feeding on you) for 6 hours for disease transmission to occur. Mortality is 3-5% treated, 20-30% untreated, so don’t mess around with this one either.
For more information go to http://www.cdc.gov/ticks/diseases/rocky ... r/faq.html

Lyme disease, as it is traditionally known, does not exist around here. There is a very close cousin to Lyme disease in the Midwest. True Lyme does exist just north of us, in the Wisconsin/Minnesota/Michigan area, as well as the northeastern US, and extreme western US. We do have Lyme-like disease around here. It is Southeastern Tick-Associated Rash Illness (STARI), as coined by the Centers for Disease Control (CDC). It has some of the symptoms of Lyme disease, but appears to be more self-limited and less severe in its presentation. Patients who apparently have STARI may present with a rash similar to the typical “Bulls-eye” rash seen in traditional Lyme disease. This is a newly discovered disease, but with appropriate treatment, there is no evidence of the long-term ramifications of true Lyme disease. Additionally, there are several websites and clinics dedicated to “Chronic” Lyme disease. In New England, these may be more appropriate, but in our geographic region, true Lyme disease does not exist, and thus there is no “Chronic” Lyme disease in this area. We are still learning a lot about STARI though.
For more information go to http://www.cdc.gov/ncidod/dvbid/stari/ and
http://www.cdc.gov/ncidod/dvbid/lyme/index.htm

There are a plethora of other tick-borne diseases, though the above are the main ones you may encounter in this area. If you travel much, either nationally or internationally, or spend much time hiking or camping, you will need to be aware of many other tick-borne diseases. Many of these diseases are specific to a certain region or environment. Make sure your doctor knows where you have been on recent trips if you have any unexplained symptoms and may have been exposed to any tick-borne diseases. And remember, travel exposure may not be in the traditional sense. Over 29 foreign tick species have been brought into the United States on imported reptiles legally brought into this country. These ticks may transmit a multitude of diseases not normally found nor expected in this area.

What can you do to reduce ticks and transmission of tick-borne diseases??

Do not let these facts scare you away from the outdoors—more of us should participate in and enjoy outdoor activities. Take preventive measures to decrease the chance of disease transmission. Wear light colored clothing, as it is easier to see ticks and remove them before they attach and begin to feed. Check yourself frequently and remove any moving or attached ticks immediately (see below for removal methods for attached ticks). Use a mirror to check those hard to see/reach places, or recruit someone to do this for you. Monitor for the above signs and symptoms if you notice an attached tick, and note the time of exposure/attachment of the tick and removal of the tick, and onset of symptoms. There is absolutely no need to simply start antibiotics for a uncomplicated tick bite (unless you are pregnant—if so, see your doctor right away). Go to your doctor as soon as you experience any of the above symptoms and give them a good history and timeline of events. I am personally not a huge fan of chemicals, though insect sprays containing near or equal to 100% DEET are good deterrents for ticks. Any less than 33% regular DEET will not deter ticks. Do not use high conentrations of DEET on children. A product called Permanone, or other permethrin containing tickicide is great for killing ticks. However, it is a skin irritant and is NOT to be used on, nor allowed to contact, skin, nor use for children. It will remain on clothing or fabrics through several washings at high enough concentrations to kill ticks. The fancy-dancy outdoor places like Cabela’s and Bass Pro Shops, as well as the internet, sell permethrin permeated clothing (www.exofficio.comhttp://www.insectshield.com/AboutUs/BrandPartners.aspxwww.insectrepellentwear.com, and www.orvis.com) are a few.

Most tick-borne diseases are easily treated with oral antibiotics, and rarely ever need intravenous antibiotics. If you find a doctor wanting to start you on intravenous antibiotics, and you are aware of this, and not physically in the Intensive Care Unit, find another doctor. There are a few fraudulent “Lyme docs” out there. Most patients do very well with oral treatment, with early recognition. The key, however, is early recognition and treatment of these diseases.

How do I remove ticks once they’re on me??

For free ranging/non-attached ticks, simply pick them off and discard them (i.e., throw them out the window when going 60 MPH—they may bother somebody else, but not you), place them in a bottle with a lid, and dispose of them in the recycle bin, put them in a bottle of alcohol for morbid collection purposes, etc.

For larvae (seed ticks—less than 1mm in size), get some duct tape, and place on your skin where the ticks are (there can be hundreds or thousands of these) and simply peel them off. Another method is to scrape them off with a credit card/bank card, drivers license, etc. These ticks are TINY and have even tinier mouth parts, which only go into your skin a few microns.

For larger ticks (nymphs—the equivalent of juvenile delinquents, or adult ticks), follow the recommendations on the next page. Fancy tick removal tools exist, again, at the same stores mentioned above, but plain old tweezers work just as well, and cost way less. Keep one in your bike bag, or vehicle.

Safe tick removal method:

Gently grasp the tick close to the skin with fine forceps and gently and steadily retract backwards. This will reduce the chance of the tick to leave mouth parts in your skin, and will minimize disease transmission. Clean the area afterwards with alcohol and/or hydrogen peroxide, then cover and keep clean. Observe the area for any signs of infection, and if any redness occurs more than a few days after the tick removal/bite, see your doctor. You can get a local infection, as ticks do not use alcohol wipes to clean the area before they bite. If you get a local redness within a few days at the bite site, that itches a lot, it is a local reaction to the tick proteins they secrete to thin your blood and stay on. It should resolve within a few days. If not, see your doctor.
Also see: http://www.cdc.gov/ticks/tick_removal.html

DO NOT USE methods such as hot matches, Vaseline, alcohol, etc., and do not “snatch” the tick off. Use gentle steady traction straight out, in line with the ticks mouth parts. Place the tick in a bottle of alcohol, and label it with the date and time of removal and where it was found in case tick identification is needed for disease confirmation.

For questions regarding ticks and for tick identification, feel free to contact me via email. While I can not give you direct medical advice, I can help your physician identify ticks, and can help point you in the right direction for a physician if you do not already have one, or a local infectious disease specialist if needed, for more intensive review.

drgacummins(AT)gmail(DoT)com

Greensfelder Figure 9 Epic



Ok, so it's not a Figure 9, and it's not exactly an epic-- yet. Give us some more time on that part. Nevertheless, you can now get in a ride right in your own backyard that until recently, would have had you driving a fairly long way.

There's less than a week until the Greensfelder Challenge Race on May 8th, when we'll finally get to showcase the hard work that's gone into reroutes, maintenance, and brand new trail on the Dogwood, DeClue, and Eagle Valley trails. If that's not enough, all of the proceeds from the race are generously being donated to GORC!

GORC is having a big party at the race, and you're invited. Even if you don't want to race, come on out and ride the trails, and see what's new. Not interested in doing loops on the race course? You can get in a ride of ~18 miles (of which 1.25 is doubletrack and pavement) that makes use of all of the singletrack GORC has built, and doesn't include the same trail in the same direction. You can get the map here.

The short overview is:
- Begin at the Roundhouse main parking lot
- Dogwood
- DeClue CCW
- Deer Run down to Eagle Valley
- Left on Eagle Valley to new singletrack- up to Visitor Center
- Left on bridle path to Scenic Loop
- Scenic Loop back to DeClue
- Declue and Dogwood in the opposite direction that you did earlier.

We had hoped to include the singletrack on Eagle Valley in the race course, but it's not quite ready for prime time. The lower leg up the first switchback will require some dismounts at several swampy spots, but we're hoping to fix them in the near future. The upper leg is in great shape.

There are big plans for more trails at Greensfelder, so come out on race day, and ride, have some fun, and see how you can get involved. The more people we have at workdays, the faster we can get new trail built!

Creve Coeur Workday- Saturday, May 1st

Creve Coeur Lake Memorial Park, Bootlegger’s Run Trail Extension
What: Help continue trail construction that will extend the Bootlegger’s Run Trail along the hillsides overlooking the lake.

When: Saturday, May 1st From 9am - 1pm (FREE LUNCH!) – if dry - Bike or Hike After !

Where: Upper Creve Coeur Lake Park (Entrance off Dorsett Rd - Follow Signs to the meeting area at the North end of the park).

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

GORC & St. Louis County Parks provide: Trail building tools, instructions on trail building, and safety guidelines.

Please contact Sue Kuhnert at 314-615-8822 or email skuhnert@stlouisco.com if you plan to attend.

Volunteers will be rewarded with give-a-ways from Alpine Shop and lunch and breakfast snacks will be provided by St. Louis County Parks.

Update (4-28): It's Wednesday, and there are only 2 people signed up to attend on the message board. If you can spare the time, please come out and help.

Castlewood Workday- Saturday, April 24th

Alright everyone, LISTEN UP!!!
On Saturday, April 24th we will continue the work on one of our favorite but most neglected trails. The Cedar Bluff Trail at Castlewood is in dire need of our helping hands. An 1800+ foot re-route has been started to begin restoring this trail to its former greatness. The initial workday last month set a great foundation but we need to get this re- route done! With a good number of volunteers, we can see this re- route gets completed and opened up. Lone Wolf Coffee Company will be providing an excellent lunch for all volunteers.

Details? From 9:00 am till 1:00 pm on Saturday, April 24th. Meet at the Sherman Beach Trailhead off St. Paul Road in Sherman, MO.

Directions? Sherman Beach Trailhead is located off St. Paul Road in Sherman, MO. From Big Bend Rd. and 141 take the following:
Big Bend Rd. west to New Ballwin Rd.
Take a left onto New Ballwin Rd.
Turn right onto Kiefer Creek Rd.
Turn left onto St. Paul Rd.
Follow St. Paul Rd to Sherman Beach Trailhead on the left

What to Bring? You’ll need gloves, eye protection, water, and protective clothing (there are ticks).

RSVP? Lunch will be provided by Lone Wolf Coffee Company following the workday. Make sure you let us know if you will be attending by posting on this thread.


What is Provided? GORC will supply trail building tools, safety instructions on the tool usage, instructions on how to build and maintain trails, and Lone Wolf Coffee Company will be providing a great lunch.

Why? Cedar Bluff Trail has been subject to abnormally high amounts of erosion over the last several years and its time it gets a little attention. This re-route will provide a more sustainable, enjoyable piece of trail.

After the Workday? Chow down on the great lunch provided and then, trail conditions permitting, ride!

Lone Wolf Coffee Company: www.lonewolfcoffeecompany.com

More Greensfelder Fun

Craig working on armoring

Finished Section

We spent this past Saturday finishing off the addition of a brand new 3/4 mile section of the DeClue trail (thanks Americorps!), armoring some muddy problem spots, and deberming a long stretch of trail. Most of this was done in preparation for the Greensfelder Challenge Race on May 8th. All of the proceeds from this race will go to GORC.

Everyone involved in the race should be very grateful that we were able to talk Matt out of running the course the way he had originally planned. He kept saying that if he could ride it 32x16 fixed on his rigid 29er that everyone else ought to be able to ride it as well, but cooler heads prevailed, and the majority of the climbing is now on gravel rather than Rockwoods boulder-field. The course is pretty much part of the standard GORC rides out there anyway.


Mr. Seamonkey has reconstituted himself (except for his back which was not properly hydrated apparently), and created a blog dedicated to the race for your enjoyment and enlightenment. Please be sure and answer the poll questions, and provide any feedback you might have. We always like to know what people are thinking!

April 10th, Greensfelder Workday

Greensfelder Workday
April 10th, 2010, 9am to 1pm
Trail Construction

Date: Sat, April 10th, 2010, 9am to 1pm (FREE LUNCH!) – Bike or Hike After!

Location: Greensfelder Park, St. Louis County

What: Help build new trail and do maintenance at Greensfelder Park in preparation for the May 8th Federation of Dirt Greensfelder Challenge. We will be adding 0.7 of a mile of singletrack to the Declue Trail and armoring several drainages.

Where: Greensfelder Park, Allenton Rd. behind Six Flags (Park at Tower Lot)

Take Interstate 44 to the Allenton/Six Flags Exit 261. Go north on Allenton Rd, past the Six Flags entrance. Allenton Rd. bisects Greensfelder Park. Lunch will be afterwards at the Mueckerman Shelter located at the corner of Allenton and Hencken road.
(See www.gorctrails.com for directions and details of the park)
What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

Advance registration is required for Saturday. Please contact Sue Kuhnert at 314-615-8822 or email skuhnert@stlouisco.com

GORC & St. Louis County Parks provide: Trail building tools, instructions on trail building, and safety guidelines.

Creve Coeur Workday- Saturday, March 27th

What: Help continue construction that will extend the Bootlegger’s Run Trail along the hillsides overlooking the lake.

When: Saturday, March 27th From 9am - 1pm.

Where: Upper Creve Coeur Lake Park (Entrance off Dorsett Rd - Follow Signs to the meeting area at the North end of the park). (See GORC's Creve Coeur page for directions and details of the park).

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

GORC & St. Louis County Parks provide: Trail building tools, instructions on trail building, and safety guidelines

Signup and more information is available here.
Please contact Sue Kuhnert at 314-615-8822 or email skuhnert@stlouisco.com if you plan to attend.

Volunteers will be rewarded with give-a-ways from Big Shark Bicycle Company with lunch and breakfast snacks provided by St. Louis County Parks. Afterwards, if it's dry, we'll ride the trail that was just built.

Matson Hill Workday- Saturday, March 20th

When: Saturday, March 20th, 2010. From 9:00~1:00.

What: We're having the 1st of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain biker, hikers, and trail runners are all welcome, so don’t be bashful about showing up.

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Where:
From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
• Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through the “What to expect at a workday” post. Bring your bike or trail shoes if you want to try what you built after lunch.

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):
The St. Charles County Park's (SCCP) office [636-949-7535];  through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/; or on this thread.

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.

NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.

Castlewood Workday- March 13th

On Saturday, March 13th we will be working on one of our favorite but most neglected trails. The Cedar Bluff Trail at Castlewood is in dire need of our helping hands. An 1800+ foot re-route has been planned to begin restoring this trail to its former greatness. Please, come be a part of this great event that will help keep Cedar Bluff Trail useable for years to come.

Details: From 9:00 am till 1:00 pm on Saturday, March 13th. Meet at the Sherman Beach Trailhead off St. Paul Road in Sherman, MO. Parking may be limited, so carpool as much as possible.

Directions: Sherman Beach Trailhead is located off St. Paul Road in Sherman, MO.
From Big Bend Rd. and 141 take the following:
Big Bend Rd. west to New Ballwin Rd.
Take a left onto New Ballwin Rd. RdTurn right onto Kiefer Creek Rd.
Turn left onto St. Paul Rd.
Follow St. Paul Rd to Sherman Beach Trailhead

For google maps directions, type 1582 st. paul rd, sherman, mo into the search box.

What to Bring: You’ll need gloves, eye protection, water, and warm, protective clothing.

RSVP: Lunch will be provided by Lone Wolf Coffee Company following the workday. Make sure you let us know if you are going to attend. That way we can make sure everyone gets some delicious grub following all the hard work.

What is Provided: GORC will supply trail building tools, safety instructions on the tool usage, and information on how to build and maintain trails.

Why: The Cedar Bluff Trail has been subject to abnormally high amounts of erosion over the last several years and is in need of attention. This re-route will provide a more sustainable, enjoyable piece of trail.

After the Workday: Chow down on the great lunch provided, and then, trail conditions permitting, ride!

SIUE Workday- Saturday, March 6th

When: Saturday, March 6th, 2010. From 9:00~1:00.

What: We are doing some much needed maintenance work at SIUE. The trails received very little TLC last year, so let's get them spruced up for Spring '10.
We will be doing a short re-route around the mudpit on Trail 1, as well.

Why: SIUE is a super popular trail system that gets a lot of use, and is all dirt, so it needs quite a bit of work to keep it truly sustainable.

More Info: Please RSVP via this thread where you can ask questions or find more details.

Directions: From the Highway 40/94 interchange, Take hwy 255 North past Interstate 270, to New Poag Road. Turn Right or East at the end of the exit ramp. Stay on New Poag Road until the first intersection with a 4 way stop sign. This will be University Drive. Turn Right onto University Drive. The road will immediately bend to the left, at the end of the bend on your right is a gravel road, turn onto the gravel road. Follow the rock road past the hedgerow on the left, the road will make a 90 Degree turn to the right and then back to the left, then it will dead end. The Northernmost Trailhead is located at the 90 degree corner of the woods near that dead end.

What to bring:
Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through pilznr’s “What to expect at a workday” post, available via this link.

GORC will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch. There will be giveaways as well. Bring your bike. There will be some sort of a ride afterwards, even if we cannot ride the trails due to conditions. There are miles and miles of bike paths in Madison County for your riding enjoyment if it is too muddy.

Sponsor: The Cyclery is sponsoring this workday and will be providing lunch from Blimpies, some great swag. Stop on by their shop after the workday and say hello. They are good people.

They're located at 2472 Troy Road, Edwardsville, IL 62025 and you can contact them at 618-692-0070, Store Hours: M-F 9-8, Sat 9-5, Sun 12-4.

Greensfelder Workday - Feb. 27th, 9am - 1pm

Yellow line represents new trail reroute to eliminate fall line at the end of the DeClue trail. Blue is existing DeClue. Trail in Blue after Yellow line intersecton will be reclaimed back to forest. This will be about a .35-.45 mile piece of new singletrack built to IMBA standards.


Date: Sat, Feb 27, 2010, 9am to 1pm
Location: Eureka, MO

Join GORC & St. Louis County Parks at Greensfelder Park on Sat, February 27th, 2010 from 9am to 1pm to help build new trail and re-route sections of existing trail at Greensfelder Park.

We will be re-routing a short steep section at the end of the Declue/Greenrock Trail where it ties into the Scenic Loop road.

Come out, work with us in the morning, we'll serve you a nice lunch, and then we'll bike or hike afterwards.

How to get there: You're headed for Greensfelder Park on Allenton Rd. behind Six Flags. You should park at the Tower Lot. Take Interstate 44 to the Allenton/Six Flags Exit 261. Go north on Allenton Rd, past the Six Flags entrance. Allenton Rd. bisects Greensfelder Park. Lunch will be afterward at the Mueckerman Shelter located at the corner of Allenton and Hencken road.

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.
What GORC & St. Louis County Parks provide: Trail building tools, instructions on trail building, and safety guidelines.

Maplewood Bicycle is sponsoring this workday and will have coupons available after the workday. Check out their website for training classes related to bicyclists.

Advance registration is required. Also, post on the messageboard if you are attending. Please contact Sue Kuhnert at 314-615-8822 or email skuhnert@stlouisco.com

Cancelled- SIUE Workday- Saturday, February 6th

Straight from Kirby:

I am canceling the workday. Even w/o the snow, the mud on the trails will make it very dangerous to get around with sharp tools. Please pass the word. We will reschedule when it is less dangerous and probably snowy. Watch for it.

Upcoming Events


Jan. 31st- Midwest Bike Expo in Collinsville, IL. GORC will have a booth there where you can find out more info about the latest projects, pick up some literature or maps, or buy some GORC merchandise.

Feb. 3rd- Regular monthly meeting at the Schlafly Tap Room.

Feb. 6th- The trails at SIUE have taken a real beating and need some attention.. We'll be rerouting a section near the asphalt on Trail #1 which has turned into a permanent mudpit, as well as fixing some of the other problem areas that have developed. More info and sign up for the workday.

Feb. 27th- Greensfelder Workday. We're continuing work on the switchbacks which will complete the DeClue extension and carry the trail all the way over to the Scenic Loop Road. Bryan has posted some pictures of the fun involved in getting the rocks down to the site posted on the GORC Facebook Page. We'll also work on getting other areas of the existing trails into riding shape. More details and signup as they become available.

Feb. 28th- The first of St. Charles County Parks Moonlight Ride series will be held at Broemmelsiek Park from 6-9pm. These are organized rides in parks that usually don't permit riding at night, and are always a good time.

2009- The Year in Review


Rip flipping burgers (not with the shovel)


Edwards Creek Trail- Greenville, MI

Taking a break on Georgia Pass- Colorado Trail

Ozark Trail- Trace Creek Section (before)


Thanks to all of those who volunteered, 2009 was another busy, and successful year. Of course, the biggest highlight is the nearly 8.5 miles of trail that GORC built, or helped design. All told, GORC contributed more than 5,200 hrs of labor to the various parks in the area. This total doesn't include an additional 900 hours that were devoted to administrative duties, marketing, meetings and the website. Sadly, we also suffered a big loss with the untimely, and unexpected passing of our friend John Roth, founder of the OTA.

Here's a rundown of events from the year:
Bangert Island: 192 hours, including one workday. Added another 1.5 miles of trail. A lot of other work was put in by St. Charles County Parks with several reroutes, and cleaning up after the island flooded several times.
Broemmelsiek: 203 hours. A short connector trail was completed to provide better flow at the rear of the park.  Several reroutes were also added to eliminate water issues.
Castlewood: 112 hours. A workday on National Trails Day in June did maintenance in the park.
Chubb: 166 hours, including 2 workdays. Maintenance along the river to provide a reroute around a washed out culvert. Began construction of a an alternate route around a fall-line section west of the picnic table.
Cliff Cave: 84 hours. First steps are being taken in getting the trails back into shape. Watch for workdays in the future.
Creve Coeur: 778 hours, including 3 workdays on Bootlegger's Run trail. This trail just opened last year, and there are already 3 miles of new singletrack,
right in the heart of the STL metro area. Lots more to come, including some interesting terrain near the bluffs.
Greensfelder: 929 hours, including 4 workdays. Mostly spent on completing the reroute of the DeClue extension, which is nearly finished save for completion of
2 switchbacks. GORC also designed a section of singletrack which completes the Eagle Valley loop behind the Visitor Center, and led crews on 3 other workdays organized by St. Louis County parks.  Maintenance crews fixed several problem areas by armoring and rerouting the trail.
Indian Camp Creek: 497 hours, including 5 workdays devoted to continuation of new section of trail and reroutes of problem sections that were flooded or washed away.
Klondike: 170 hours, including 2 workdays. Completed Riptide, the last of the wooden structures at the park.
Lost Valley: 864 hours, including 4 workdays, and one additional workday. 2.75 miles of new singletrack replacing the collapsed bridge and bypassing an often muddy meadow area and some old doubletrack.
Matson Hill: 585 hours, including 3 workdays. Some reroutes to prepare the trail for heading back to the newest section of the park which will result in perhaps an additional 10 miles of singletrack! ~1.5 miles of new trail also built in that direction.
North Trace/Council Bluff: 408 hours over 4 outings. 2 were clearing the trail of deadfall, one after the incredible storms in May which closed nearly 80 miles of trail, some of which are still not open. Another was a reroute of a section in which the trail actually ran in a creek bed, and had been an irritant for years. Also cleared the trail in preparation for the  Burning at the Bluff.
Quail Ridge: 94 hours. 1/8th mile trail section added below the dam with assistance from SCCP maintenance crew to move trail away from eroding creek edge. Several small reroutes to eliminate water issues.
SIUE: 130 hours of maintenance and bike patrol.

Midwest Mountain Bike Summit: this year it was in Grand Rapids, MI, and several GORC members made the trip to sample a different kind of riding experience than we have at home. Mike Dunston also led an armoring workshop which constructed a drop on the downhill course at a point where it crossed an XC trail.
Breckenridge Trip: The annual GORC trip headed west to Breckenridge, CO for some spectacular riding and great beer.
Bike Patrol: GORC's chapter of IMBA's National Mountain Bike Patrol provided support at a Take a Kid Mountain Biking day, the Burning at the Bluff race at Council Bluff Lake, and the Lost Valley Luau. This was all in addition to regular riding on many of the local trails to help trail users with any problems they might have, either mechanical or medical. Also led a series of guided rides in several St. Charles County Parks oriented for newer riders, and provided support for the Moonlight Ride series on various full moon nights, in parks which ordinarily don't allow riding at night.
Berryman Epic Race/Ride: some members participated in this 55 mile off-road epic through the Mark Twain National Forest.
Halloween Spooktacular/Volunteer Appreciation Party: provided food and
refreshments for these social events as a way of showing our appreciation for all of the help provided by volunteers throughout the year.

As always, we have big plans for area trails, and are always in need of help to implement them, so if you like what you see on your local trails, or even if you don't like it; GET INVOLVED! The trails that get built are the ones that reflect the interest of people who care enough to take the time to work on them. Please try to make it to a workday or two in 2010. See you on the trails!

Spring 2010 Workday Schedule


Clearing Corridor for new trail at Matson Hill

Spring 2010 Workdays

January 17th- North Trace Sawyer Run
February 6th- SIUE Maintenance
February 27th- Greensfelder
March 13th- Castlewood
March 20th- Matson Hill
March 27th- Creve Coeur
April 10th- Greensfelder
April 24th- Castlewood
May 1st- Creve Coeur
May 15th- Matson Hill
May 22nd- Matson Hill
June 5th- Matson Hill

Matson Hill Workday- Sat. Dec. 19th


Craig at the new DeClue creek crossing completed at the Dec. 12th Greensfelder workday
When: Saturday, December 19th, 2009. From 9:00am-1:00pm.

What: We're having the last workday of the year at Matson Hill Park, and everyone is invited. 

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Directions: Please note that we are not parking at the main Matson Trailhead/parking lot.

From the Highway 40/94 interchange:
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. 

• You can also click this for a Google map link. Clicking the green bike will give you the “get directions” link. 

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through the article “What to expect at a workday”.

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):


GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch (menu still TBD, but rumored to be Bekin’s chicken chili).

Greensfelder Workday and Volunteer Appreciation Party



Saturday, December 12th from 9am-1pm we'll be working on rerouting the section around the creek crossing below the rock garden. This is a fall-line section that's unable to be maintained. After this, there will be only a few other sections on both DeClue and Dogwood which are fall-line, and should help extend the time that Greensfelder is rideable throughout the year. We're also going to be doing a short reroute on the DeClue extension, and if we have enough people, there are a lot of other little projects we can work on.
Afterwards, there will be a party with refreshments for GORC volunteers to thank them for the hard work they've put in over the year to build new trails, and make the ones we have better. More info and sign-up are here.

Separated at Birth?


November/December Happenings



A little slow reporting things lately. Some items of note:

The Nov. 14th workday at Creve Coeur Park saw the completion of the latest segment of the Bootlegger's Run trail. There's now nearly 3 miles of singletrack there with more to come! The map has been updated to show all of the trail in the upper section of the park.

Mike Dunston, Craig and the St. Charles County crew have been busy continuing work on an extension at Indian Camp Creek, new trail at Matson, and some short reroutes at Bangert Island.

Wednesday, December 2nd at 7pm will have the regular monthly meeting at the Tap Room.

Friday, December 4th at 7pm is the last of St. Charles County Parks Moonlight Ride series for the year. This one is at Bangert Island. Meet at the Lewis & Clark Boathouse near Frontier Park, ride, and then have some post-ride refreshments at the Trailhead Brewery. More details are here.

Saturday,December 5th at 9am there will be the last workday of the season for Lost Valley. With a good turnout, we will be able to complete a new 1.5 mile section of singletrack that will replace the muddy stretch through the meadow along the fenceline. It wasn't too long ago that Lost Valley had almost no singletrack at all, and with the latest addition, it should put it up close to 5 miles, with the total length of the loop at around 11.5 miles. Please come out and help if you can. As usual, there will be food provided, and the weather looks good for a ride afterward. More info and sign-up is here.

Saturday, December 12th
at 9am will be the start of a Greensfelder workday, followed by the GORC Volunteer Appreciation Party. We will be constructing a reroute around the fall-line section of the DeClue trail below the rock garden. We can use all of the help we can get here, since there's a lot of maintenance that can be done, as well as tweaking some sections of the DeClue extension. More details on the party as they become available.

Creve Coeur Workday- Saturday, Nov. 14th

Creve Coeur Lake Memorial Park, Bootlegger’s Run Trail Extension

Help continue construction that will extend the Bootlegger’s Run Trail along the bluffs at the North end of the park and add about a mile of new trail.

When: Saturday, November 14th from 9am - 1pm (FREE LUNCH!) - Bike or Hike After !

Where: Upper Creve Coeur Lake Park (Entrance off Dorsett Rd - Follow Signs to the meeting area at the North end of the park)
(Sign up here and get more info and directions to the park.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

GORC & St. Louis County Parks provide: Trail building tools, instructions on trail building, and safety guidelines.

Please contact Sue Kuhnert at 314-615-8822 or email skuhnert@stlouisco.com if you plan to attend.

Volunteers will be rewarded with give-a-ways and Lunch from Big Shark Bicycle Company

2009 Berryman Epic Pictorial

The second running of the Berryman Epic was a wet one. With the river out of its banks and the trails in less than great shape, riders got wet and muddy but the weekend's spirit remained high.

This year the promoters scored a Mueller's beer trailer from the Springfield, MO microbrewery. The BT Epic crew provided tons of prizes and very fairly pulled tickets from a Tour or Race bucket. The winner then pulled out another ticket to see what they won. Cool! - you could end up with Winter Mint Gu or a Garmin GPS unit, it was your call.

The stars were aligned, however, because both Scott Whitaker and Lisa Troehler won two of the three Redline 8-speed d440 29ers being raffled off. The raffle entries were sorted based on sizing so the odds were better for the bikes. Way to go GORC!

Here are some weekend photos from my camera. Unfortunately, I'm missing good photos of Kevin, Steph and myself due to some blurry images.

Here's a link to the race results and below is the list of Tour riders I found online:
First finishers of the Tour are in:

Gerald Hart 6.41.16
Nate Means 6.50.56
Lawrence Colvin 6.54.53
Clinton Chandler 7.13.39
Lonnie Kinkade 7.13.40
Scott Saunders 7.22.26
Jamie Roberts 7.46.27
Bill Turner 8.17.16
Matthew Soraghan 8.17.17
Cynthia Bradley 8.23.47
John LeBlanc 8.24.03
Lorinda Putter 8.24.33
Yuri Cook 8.24.34
James Mercer 8.24.35
Alan Corum 8.28.30
Lisa Longinotti 8.28.31
Jessica Kovarik 8.35.10
Dan Clinkinbeard 8.35.11
Donovan Evans 8.55.23
Jiri Doksansky 8.55.46
Joshua Carroll 8.57.08
Jim Davis 9.03.55
Jeff Mittler 9.03,56
Jeff Foes 9.06.20

As for GORC member racers here's some from the list:

Placement out of 110 finishers or so

12 Mike Barro - Momentum Cycles Racing 5.10.03 (2nd place SS!!!)
20 Larry Koester - GORC 5.30.35 (4th place SS ?!!?)
38 Bryan Adams - GORC 5.58.10
43 Brian Busken - Momentum Cycles Racing 6.01.15
64 Scott Peipert - Wild Trak Bikes 6.46.58
86 Rob Ballou - GORC 7.31.45
90 Kevin Bonney - Mesa Cycles 7.39.46
95 Wendy Davis - Trail Monster 7.49.12
114 Matt Hayes GORC DNF (ouch!)

PS - getting a cabin is the only way to go!



Saturday Tour Day

The river at Bass River Resort was out of its banks and only the taller full-size trucks could brave the waters towing tandem trailers to bring Tour riders to the other side. The water was waist-deep at the low-water bridge crossing.

Joshua Carroll (finished) and Scott Whitaker (rode approx. 28mi) ready for 56 miles of wet fun.

Shot of the Tour riders getting the lowdown.

Lisa (rode about 45mi) crossing the bridge at Brazil creek

Jim Davis (finished) crossing the Brazil Creek


Sunday Race

Racers crossing the river using a tandem trailer and some palettes to stay dry. One rider tried to pass everyone and ended upside down in the river. Wet and foolish at the same time. Ouch.


Scooter checking in at Berryman.

Bryan Adams getting some refills...

Larry Koester on his rigid 29er SS. He did very well on his first Berryman Epic.

Hats off to the promoters - Springfield Bike Co. - for clearing the trail of deadfall and posting 300+ trail arrows. I don't think anyone got lost.

Get ready for next year.

The Berryman Epic - Tour & Race - Oct. 25 - This Weekend

The forecast, unfortunately, has been accurate - it has been raining all day today, Thursday, Oct. 22, 2009. But, the Berryman Epic is upon us and we must be optimistic. This weekend over 100+ mountain bikers from across Missouri and maybe beyond will ride or compete in the Berryman Epic Tour & Race.

Fifty-five miles of singletrack and gravel road awaits us in the middle of the Missouri Ozarks. Hosted by Bass River Resort off Highway 8, mountain bikers will ride for the better part of 6+ hours across some of the state's best Ozark region trails including the Berryman Trail (a 25 miles loop!), almost the entire Courtois section of the Ozark Trail, and some local fireroad/gravel roads.

The Berryman Epic is in its second year and has a substantial cash prize purse and swag offering. While it has been raining this week off and on, racers and tour riders alike look forward to this fall epic. What better way to enjoy the Ozark Trail than to make a weekend of it where all the deadfall has been removed and the trail has been copiously marked?

The race/tour fell on an Ozark Trail Association mega-workday weekend and this year the same has proven true. Be sure to say hi to the great volunteers of the OTA as they camp out in conjunction with the Berryman Epic Tour/Racers at the Bass River Resort. GORC fully supports the multi-use trail efforts of the OTA and commend them for increasing the trail mileage of the Ozark Trail.

Promoting Us at REI National Park Night

Tuesday night several club members went to REI to showcase the goods and the goodness of GORC. Held at the REI in Brentwood, the night celebrated being outdoors and the country's treasures - our National Parks. REI sponsored the night and promoted Ken Burns' new National Parks documentary.

We sold a few hoodies and answered questions about the local trails. If just one new person comes out to a workday or joins the club then you could call the night a success. We also made contact with a few other organizations that are on the lookout for volunteer opportunities for their respective members.

Organizations also in attendance tonight included the Wild Bird Sanctuary, St. Charles County Parks, St. Louis County Parks, Missouri Conservation Department, the Ozark Trail Association and several other groups.

We will also be selling our hoodies and shirts at the Berryman Epic this weekend. Be sure to stop by and say hi.

See you on the trail!

Creve Coeur Workday- Saturday, Oct. 17th

We will be continuing the section of trail that was started last spring along the steep hillside at the North end of the park, heading out and around the tip of a ridge, then exiting the woods opposite the playground area where the road splits into a 1-way loop. When the leaves drop this section will have scenic views of the lake and valley below.

Where: Upper Creve Coeur Lake Park (Entrance off Dorsett Rd - Follow signs to the meeting area at the North end of the park) See here for more discussion.

Please contact Sue Kuhnert at 314-615-8822 or email skuhnertATstlouiscoDOTcom if you plan to attend and post up here.

Volunteers will be rewarded with give-a-ways from Big Shark Bicycle Company, and breakfast snacks and lunch are provided by St. Louis County Parks.

Great Things Happening at Greensfelder

There's so much happening at Greensfelder it's hard to know where to begin. First off, this past Spring saw the development of a maintenance program which is working to keep the trails in good condition, so that we're able to ride them longer than just the peak Summer/Early Fall seasons. There was a race at Dogwood last weekend, after a week with several days of steady rain, and the trail was in great shape. This probably wouldn't have happened last year. There's still a lot of work to do in this regard, but we've made great progress so far. If you're interested in helping, watch for notice of outings in the Greensfelder forum.

St. Louis County Parks also broke ground last weekend on a 1/2 mile section of GORC-designed singletrack that will complete the Eagle Valley trail as a loop coming out at the Visitors Center. This will add a lengthy option for riding in the Park. We're not sure yet how this will best be incorporated into a loop, but it is easy to get from the Green Rock crossing at Scenic Loop Rd. to the Eagle Valley in several different ways.

Work is continuing on the DeClue which will extend it from below the radio tower to the Scenic Loop Rd. It's already possible to do this in some manner, so come on out to a workday or First Sunday ride and find out how.

If any of this sounds good to you, then please come out to the Workday on Sat. Oct. 3rd.
Maplewood Bicycle is sponsoring this workday and will be providing coffee, juice and bagels. They will be providing cool swag giveaways.

Details:
9am - 1pm, lunch provided, group ride following lunch
Meet at the "tower" parking lot - first paved lot on the right side of Allenton road coming up from 6 Flags.
More details are here, and you can sign up for the workday here.

Indian Camp Creek Workday- Sept. 26th



We're close to finishing the 4 fingered connector that runs on top of the ridgeline, and can use all the help we can get. This section has been under construction for awhile, so hopefully we can get it done this fall.
Please note: We'll be meeting at Shelter 6 at 9am rather than the main trailhead.
More information can be found here.

Chubb Workday- September 12, 9am

You know it, you ride it, you love it. Come out and help give the Chubb a little TLC. Fred has some reroutes planned for a couple of the fall-line sections leading up to the picnic table. More info on the workday is here. Check out this older article by Sam to find out a few things about the trail itself.