What: Help continue construction that will extend the Bootlegger’s Run Trail along the hillsides overlooking the lake.
When: Saturday, March 27th From 9am - 1pm.
Where: Upper Creve Coeur Lake Park (Entrance off Dorsett Rd - Follow Signs to the meeting area at the North end of the park). (See GORC's Creve Coeur page for directions and details of the park).
What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.
GORC & St. Louis County Parks provide: Trail building tools, instructions on trail building, and safety guidelines
Signup and more information is available here.
Please contact Sue Kuhnert at 314-615-8822 or email skuhnert@stlouisco.com if you plan to attend.
Volunteers will be rewarded with give-a-ways from Big Shark Bicycle Company with lunch and breakfast snacks provided by St. Louis County Parks. Afterwards, if it's dry, we'll ride the trail that was just built.
Matson Hill Workday- Saturday, March 20th
When: Saturday, March 20th, 2010. From 9:00~1:00.
What: We're having the 1st of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain biker, hikers, and trail runners are all welcome, so don’t be bashful about showing up.
This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.
Where:
From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
• Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)
What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through the “What to expect at a workday” post. Bring your bike or trail shoes if you want to try what you built after lunch.
Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.
Please RSVP via ONE of the following (to make sure we bring enough food):
The St. Charles County Park's (SCCP) office [636-949-7535]; through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/; or on this thread.
GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.
NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.
What: We're having the 1st of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain biker, hikers, and trail runners are all welcome, so don’t be bashful about showing up.
This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.
Where:
From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
• Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)
What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through the “What to expect at a workday” post. Bring your bike or trail shoes if you want to try what you built after lunch.
Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.
Please RSVP via ONE of the following (to make sure we bring enough food):
The St. Charles County Park's (SCCP) office [636-949-7535]; through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/; or on this thread.
GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.
NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.
Labels:
2010,
matson hill,
singletrack,
workday
Castlewood Workday- March 13th
On Saturday, March 13th we will be working on one of our favorite but most neglected trails. The Cedar Bluff Trail at Castlewood is in dire need of our helping hands. An 1800+ foot re-route has been planned to begin restoring this trail to its former greatness. Please, come be a part of this great event that will help keep Cedar Bluff Trail useable for years to come.
Details: From 9:00 am till 1:00 pm on Saturday, March 13th. Meet at the Sherman Beach Trailhead off St. Paul Road in Sherman, MO. Parking may be limited, so carpool as much as possible.
Directions: Sherman Beach Trailhead is located off St. Paul Road in Sherman, MO.
From Big Bend Rd. and 141 take the following:
Big Bend Rd. west to New Ballwin Rd.
Take a left onto New Ballwin Rd. RdTurn right onto Kiefer Creek Rd.
Turn left onto St. Paul Rd.
Follow St. Paul Rd to Sherman Beach Trailhead
For google maps directions, type 1582 st. paul rd, sherman, mo into the search box.
What to Bring: You’ll need gloves, eye protection, water, and warm, protective clothing.
RSVP: Lunch will be provided by Lone Wolf Coffee Company following the workday. Make sure you let us know if you are going to attend. That way we can make sure everyone gets some delicious grub following all the hard work.
What is Provided: GORC will supply trail building tools, safety instructions on the tool usage, and information on how to build and maintain trails.
Why: The Cedar Bluff Trail has been subject to abnormally high amounts of erosion over the last several years and is in need of attention. This re-route will provide a more sustainable, enjoyable piece of trail.
After the Workday: Chow down on the great lunch provided, and then, trail conditions permitting, ride!
Details: From 9:00 am till 1:00 pm on Saturday, March 13th. Meet at the Sherman Beach Trailhead off St. Paul Road in Sherman, MO. Parking may be limited, so carpool as much as possible.
Directions: Sherman Beach Trailhead is located off St. Paul Road in Sherman, MO.
From Big Bend Rd. and 141 take the following:
Big Bend Rd. west to New Ballwin Rd.
Take a left onto New Ballwin Rd. RdTurn right onto Kiefer Creek Rd.
Turn left onto St. Paul Rd.
Follow St. Paul Rd to Sherman Beach Trailhead
For google maps directions, type 1582 st. paul rd, sherman, mo into the search box.
What to Bring: You’ll need gloves, eye protection, water, and warm, protective clothing.
RSVP: Lunch will be provided by Lone Wolf Coffee Company following the workday. Make sure you let us know if you are going to attend. That way we can make sure everyone gets some delicious grub following all the hard work.
What is Provided: GORC will supply trail building tools, safety instructions on the tool usage, and information on how to build and maintain trails.
Why: The Cedar Bluff Trail has been subject to abnormally high amounts of erosion over the last several years and is in need of attention. This re-route will provide a more sustainable, enjoyable piece of trail.
After the Workday: Chow down on the great lunch provided, and then, trail conditions permitting, ride!
Labels:
2010,
castlewood,
maintenance,
reroute,
singletrack,
workday
SIUE Workday- Saturday, March 6th
When: Saturday, March 6th, 2010. From 9:00~1:00.
What: We are doing some much needed maintenance work at SIUE. The trails received very little TLC last year, so let's get them spruced up for Spring '10.
We will be doing a short re-route around the mudpit on Trail 1, as well.
Why: SIUE is a super popular trail system that gets a lot of use, and is all dirt, so it needs quite a bit of work to keep it truly sustainable.
More Info: Please RSVP via this thread where you can ask questions or find more details.
Directions: From the Highway 40/94 interchange, Take hwy 255 North past Interstate 270, to New Poag Road. Turn Right or East at the end of the exit ramp. Stay on New Poag Road until the first intersection with a 4 way stop sign. This will be University Drive. Turn Right onto University Drive. The road will immediately bend to the left, at the end of the bend on your right is a gravel road, turn onto the gravel road. Follow the rock road past the hedgerow on the left, the road will make a 90 Degree turn to the right and then back to the left, then it will dead end. The Northernmost Trailhead is located at the 90 degree corner of the woods near that dead end.
What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through pilznr’s “What to expect at a workday” post, available via this link.
GORC will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch. There will be giveaways as well. Bring your bike. There will be some sort of a ride afterwards, even if we cannot ride the trails due to conditions. There are miles and miles of bike paths in Madison County for your riding enjoyment if it is too muddy.
Sponsor: The Cyclery is sponsoring this workday and will be providing lunch from Blimpies, some great swag. Stop on by their shop after the workday and say hello. They are good people.
They're located at 2472 Troy Road, Edwardsville, IL 62025 and you can contact them at 618-692-0070, Store Hours: M-F 9-8, Sat 9-5, Sun 12-4.
What: We are doing some much needed maintenance work at SIUE. The trails received very little TLC last year, so let's get them spruced up for Spring '10.
We will be doing a short re-route around the mudpit on Trail 1, as well.
Why: SIUE is a super popular trail system that gets a lot of use, and is all dirt, so it needs quite a bit of work to keep it truly sustainable.
More Info: Please RSVP via this thread where you can ask questions or find more details.
Directions: From the Highway 40/94 interchange, Take hwy 255 North past Interstate 270, to New Poag Road. Turn Right or East at the end of the exit ramp. Stay on New Poag Road until the first intersection with a 4 way stop sign. This will be University Drive. Turn Right onto University Drive. The road will immediately bend to the left, at the end of the bend on your right is a gravel road, turn onto the gravel road. Follow the rock road past the hedgerow on the left, the road will make a 90 Degree turn to the right and then back to the left, then it will dead end. The Northernmost Trailhead is located at the 90 degree corner of the woods near that dead end.
What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through pilznr’s “What to expect at a workday” post, available via this link.
GORC will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch. There will be giveaways as well. Bring your bike. There will be some sort of a ride afterwards, even if we cannot ride the trails due to conditions. There are miles and miles of bike paths in Madison County for your riding enjoyment if it is too muddy.
Sponsor: The Cyclery is sponsoring this workday and will be providing lunch from Blimpies, some great swag. Stop on by their shop after the workday and say hello. They are good people.
They're located at 2472 Troy Road, Edwardsville, IL 62025 and you can contact them at 618-692-0070, Store Hours: M-F 9-8, Sat 9-5, Sun 12-4.
Labels:
2010,
maintenance,
singletrack,
siue,
workday
Subscribe to:
Posts (Atom)