Upcoming Events - February/early March


We're hoping that the weather for February is better than it was last year, because there are some significant things for area trails coming up this month and in early March.

-February 4th, Wed. is the regular monthly meeting at the Schlafly Tap Room. If you have a project you'd like to get GORC involved with, then come and talk about it.

-February 7th, Sat. there are 2 workdays, both running from 9am-1pm, so you have your choice of where to go:

Chubb-we will be clearing the river bottom trail of the logs which the recent floods left. We will also be improving the Tyson Creek crossing, which washed out during the Ike storm in September, and rerouting a small section of the trail. Look here for further details.
Indian Camp Creek-we hope to open a new piece of trail after this workday, but it will require a large turnout in order to do so.

-February 28th, Sat. 9am-1pm, Lost Valley- big things here. Pending final approval, there will be a significant amount of new trail added here to replace the section near the bridge on the northwestern side of the trail. More details will be published on the forum as they become available.

-March 7th, Sat. 9am-1pm, Matson Hill- will see us starting Phase One of construction on the new property, in addition to rerouting some unsustainable areas on the existing trail. This is the start of a multi-year project that will see Matson's singletrack triple or quadruple.

As you can see there's a lot going on, and need all the volunteer help we can get. Please consider coming out and helping. Also, look on the forum for information about planned work at Greensfelder which has 3 workdays scheduled this Spring. We're hoping to re-open the DeClue extension after some significant reworking of areas that proved unsustainable.

2008- The Year in Review





It was another busy year for GORC. Despite the challenges presented by Mother Nature, we managed to get a lot done. The Spring workday season was fairly unusual in that we were forced to cancel a number of workdays- 5 out of 12 scheduled. 3 of these were not made up. The weather made it very challenging to build, let alone ride, trails in the area. A lot of time was spent on maintenance, but we still found time for some new projects. Here are some of the highlights from this year:

-Gateway Mountain Bike Patrol is launched.
-Completed 2 new trails (5 & 6) at SIUE.
-Bangert Island opens with 3 miles of new singletrack.
-Creve Coeur Park has 2.15 miles of new singletrack.
-Work is nearly finished on the proof-of-concept skills area at Klondike Park.
-GORC membership reaches an all-time high with 170 paid members.
-Midwest Mountain Bike Festival in Peoria.
-Maintenance of North Trace Creek section of Ozark Trail.
-GORC visits Brown County, Indiana. In addition to being great fun, the quality of the trails there gives us many new design ideas for our own trails.
-Durango Trip
-Burning at the Bluff
-Berryman Epic Race/Tour
-GORC Volunteer Appreciation Party at Greensfelder.
-The Ozark Trail Association is working on the construction of singletrack between the Huzzah Conservation Area and Harmon Spring on the Berryman on the Courtois section of the OT. Once this section, called the Courtois Gap, is complete, it will be nearly all singletrack between Huzzah CA and Hazel Creek Campground. In addition, the OTA shuttle has made it possible to ride some sections of the trail, like the Middle Fork, without having to juggle cars.
-Broemmelsiek and Indian Camp Creek both have new trail sections, and maintenance was done on existing trail.
-Castlewood, Chubb, Greensfelder, and Lost Valley all had maintenance work done.
-The St. Louis Adventure Group has come out in force to help at trail workdays, with their attendance numbers rivalling those of GORC members. Many are even joining GORC and vice-versa, so this distinction between the 2 groups probably won't matter for long.
-All told GORC contributed 3992 hours of volunteer labor this year.

As usual, we have big plans for area trails, and not enough manpower to implement all of them, so if you like what you see on your local trails, please try to make it to a workday or two in 2009. See you on the trails!

GORC & the Bike Swap


Midwest Bicycle Expo and Swap Meet
Hosted by the St. Louis Regional Bicycle Federation
Sunday, January 25, 2009
9:00 a.m. – 3:00 p.m.
Gateway Center
One Gateway Drive
Collinsville, IL 62234

(just 12 minutes from the Arch)


Yes, I know, the bike swap has nothing to do with mountain biking... right?

Wrong.

If you've been wanting a new dirt ride on the cheap or want to find some used (and new) bits for your tricked-out all-rounder then you should be making plans to hit the 2009 Midwest Bike Swap.

Where else are you going to find bike frames for a couple hundred dollars, tires by the box, maybe even a few hot cyclocross bikes (my goal!)... yeah ... Bike Swap.

Our club will be present offering free information, taking memberships, allowing people to sell some things, maybe even hold a raffle... hmm. There's an antique bicycle show, a bike corral to test ride complete bikes and more fun stuff.

See you there.

Where Does My Bike Come From?



Maybe Santa left you something shiny with 2 wheels under the tree? Ever wonder where it came from? I knew in general terms that most frames, if not complete bikes, along with everything else these days, seem to come from the Far East. This article breaks it down by company.
The article where the link came from (an ad may appear on the Salon site) also provides some interesting food for thought about bikes and society in general. It would be interesting to see how much of Trek's $2 million spent on bike-friendly infrastructure advocacy goes toward mountain biking.

Upcoming Events - December


Coming up this month:

December 3- Wednesday, 7 pm- Regular monthly meeting at the Schlafly Tap Room.

December 6- Saturday, 9 am- Lost Valley Maintenance Day. Almost everyone in the world goes to LV 2-3 times a year, because this place is just plain ol' fun. So, please put this date on your schedule and come out and help perform some much needed maintenance on this beloved trail.

December 12- Friday, 7 pm- Night Ride at Bangert Island. We will be gathering in downtown St. Chuck, near the "boathouse" for a night ride at Bangert. There might be a surprise or two in store for the ride, so charge up your lights and come on out and have some fun. We also have a room reserved at Trailhead for post-ride discussions on the economy and such.

December 20- Saturday, 9 am- SIUE Workday. We are going to complete Trail 5 and make it a true loop. We will also finish up some maintenance activities on Trail 1 if we get a good turn out.

The Inaugural 2008 Berryman Epic Tour/Race:

The Inaugural 2008 Berryman Epic Tour/Race:
A Brief Report
by Matt Hayes

In early 2008 it was announced on the Internet that some race-minded folk were going to be staging their own epic-length bike race in Missouri. Their goal, it stated, was to bring a race like Syllamo's Revenge or the Ouachita Challenge to the Ozark hills. The btepic.com website started taking orders in early April for those that dared. The race payout was substantial and schwag giveaways promised to be huge.

Too soon, summer came to a close and the Burnin' at the Bluff V 12-hour came and went - in a ball of flame, of course. As the weekend of October 24-25th approached I grew anxious. Lisa even wondered what it would be like.

Will the course be marked or will get lost and resort to eating crawdads and katydids?
Would the weather cooperate or would we find mud bogs and frosty handlebars?
Would the trails be sweet or just plain suck?

The weekend before the race I went down by myself and checked out the Courtois sections at the start and below Highway 8 to get a feel for the trail and see how well it was marked. I came back and explained to Lisa that there wasn't anything to worry about - the trail was well-marked and in perfect condition. No downed trees or bad sections.

On Tour day Lisa, along with Jim and Wendy Davis, set off with 40+ riders and everyone stayed in high spirits. I drove around to each crossing with directions, a pump and water handy. I think many appreciated seeing a road, wheels and a face towards the end of the 56 mile ride. No one got injured and no one got (permanently) lost.

That evening Scott, the promoter, raffled off a ton of prizes. Several high-dollar items included 4 Redline Monocog complete bikes, a cargo trailer, a Garmin Edge 305, an LED light kit, a wheelset and a bunch of other things. Lisa and I didn't win anything but it looked as though over half the people present got a schwag prize.

That night Scott Piepert and Bryan Adams arrived to get the lowdown on the course. I told them it would be a blast. The next day would come too soon.

On race day over 92 bikers lined up in the parking lot of the Bass River Resort. At 8:30 everyone took off and it only got faster in the coming minutes. The super fast geared guys were off the front - and Matt Keeven on his single speed. Bryan, Scott and I all rode single speeds along with Jim Krewet and a couple of other folks.

The organizers had placed a temporary bridge across Brazil Creek which was a blessing. The creek is over 4 feet deep now and 15 feet wide from the equestrian traffic. All the racers ran down the switchbacks (they are nearly unrideable now), across the bridge and received their first checkpoint zip tie. I was the second ss guy through with Jim, Scott and Bryan right behind me.

Next, we jammed over the Berryman trail over to the Berryman campground. I passed several guys and felt quite good. My left knee has been giving me trouble and I had hoped a new pair of shoes, a lower bike fit, new cleats and some insole shims would do the trick. So far, so good.

Lisa met me again at the second checkpoint at the Berryman campground. Again, I was the second SS guy in but was already 5-8 minutes behind Matt "morale crusher" Keeven. I set off down the lower Courtois and tried to make up for lost time. Jim Krewet passed me at the campground checkpoint but I kept him in sight almost the whole time heading for the 3rd stop at the end of the Courtois. The trail followed several creek drainages and whenever it had to gain some elevation it shot up the hillside. I was forced to walk many of these tall climbs in order to conserve energy.

After getting to the third checkpoint I finally caught up to Jim on the gravel road back to the Berryman campground. We agreed the pace was fast and I admitted I was feeling slightly blown. My knee started hurting and I knew things didn't feel just right.

At the fourth checkpoint back at the Berryman campground I had to sit down. Lisa cheered me on but deep down I knew Jim had me. He set off on the remaining leg of the Berryman back to Bass Resort while I composed myself.


Once I hit the singletrack I knew I was in trouble. My hands were beginning to sting and blister from the rigid fork and my 32:19 sissy gearing felt hard. And then the unthinkable happened.

I really hate leg cramps but boy they sure loved me. I had to stop 7-10 times over the remaining 15 miles to keep me from losing my mind. The agony was obscene and it hurt to see people passing me. Scott Piepert passed me at the running spring and that's when I tried to pull it together and finish it off.

Limping back around 7 miles an hour and ruining my chances for a good overall placing I kept my legs turning but applied no pressure to prevent the hell cramps from popping in to say hi. At the last checkpoing Jim and Wendy cheered me on. I mentioned the cramps, the pain, the possible bonking and they wanted to know if I wanted some gum! They're pretty damn funny even when you're feeling down. I got to pedaling back to Bass and promptly got passed by 10 more racers on the gravel road back to base.

I pulled into Bass not a moment too soon and had the best ride of my summer in Missouri. The Lynskey rocked out even if I couldn't keep up and I promise to tighten my bottom bracket before starting the race next time around.

Overall, Chris Ploch got 1st overall, Matt Keeven got 1st Single Speeder (4th overall wtf?!!), Jim Krewet got 2nd SS, Scott Piepert 3rd SS, Me (Matt) 4th and Bryan Adams 5th.

Many thanks to Scott at Springfield Bicycle Co. for organizing the event and chopping out over 70 downed trees to make for a memorable (and sickly fast) race.

See you next year at the GORCtoberfest when GORC merges mayhem with the Berryman Epic. It's in the works, see you then.

Greensfelder/Klondike Workdays, Sat. Nov. 8th


Another weekend with double workdays, this time at Greensfelder and Klondike Park. Both begin at the usual time- 9 am. More info on the Greensfelder Workday can be found here, and on the Klondike one here.

The Greensfelder workday is particularly important since we lost a workday 2 weeks ago to a St. Louis County Parks scheduling conflict. Those of you who have ridden there recently have seen how good a shape the trails can be in when we have some dry weather. Remember what Dogwood looked like before GORC started working on it?

We've spent some time looking at the existing trails, and have identified areas that are especially prone to damage, mostly due to drainage issues. We think that by fixing the most troublesome spots, it will go a long way to making the Dogwood and DeClue trails much better places to ride. We're going to try to get to as many of these areas as we can, but it's a very large project and isn't going to be able to be finished in one workday. We've also looked at the DeClue extension, and are considering reroutes for several areas. These should be ready to build in the Spring if all goes well.

Creve Coeur Park/ICCP Workdays Oct. 25th



We will be working on a continuation of the trail built at Creve Coeur Park in the Spring, as shown marked in pink on the lower map. When this is complete, hopefully after the next workday scheduled for November 22nd, there will be approximately 3.5 miles of singletrack. Not bad, a 7 mile out-and-back, right in the center of the STL Metro area with more to come.

There's also a workday scheduled at Indian Camp Creek Park, so if you live out in St. Charles County, please consider helping out there.

Fall 2008 Workday Schedule Posted


Bryan posted this on StlBiking:

The following is GORC's upcoming workdays for this fall. We would appreciate your help at a workday or two. If you ride a mountain bike, you've probably ridden at one of these parks. So, come on out and help make them better. Go to GORC to find out the details. The calendar on the home page lists more specifics and go HERE to find out what to expect at a workday. Keep an eye on GORC's forum for details as the workdays draw closer.

Some tidbits...
Klondike is getting a new boardwalk over the sandpit leading to Powerline. This will be 80-100 feet long with some skinny off shoots. Construction of the Ewok village on Donkey Kong will begin next spring. We're always looking for people with freeriding experience to come give us a hand at Klondike. We want to do more there and the park is making baby steps, but most of us are XC geeks, so we need some expertise.

SIUE has added an extension to Trail 2. We'll be working on finishing up a small lollypop near there.

Greensfelder will see continued work on the Declue Extension that links up to the Scenic Loop. We've seen what a wet season can do to a new trail and have plans to nurture this trail along. Mainly, I think everyone has seen how good the Dogwood trail can be when more people go out and ride it. The Declue trail can benefit in the same way.

Creve Coeur Park
has 1 mile of new trail. We plan on tripling that this fall with your help. This park could have up to 6 miles of trail when we're done. Go check out it out, very fun.

That's just some of what's going on. So, you can see we could use your help. Pick your favorite trail and give us 4 hours of your time. It will be well worth it. Also, GORC's forum now has a Trail Reports & Conditions section for most of the local trails. Go check it out if you want to know what the latest conditions are or post up the condition if you have been there recently. You can also use this forum to list any trees down so that it gets back to the Land Manager.

Ride Report- Brown County State Park


You may have heard some of the hype for the trails at Brown County State Park in Nashville, Indiana. Well, I'm here to tell you it's all true. Last month a few of us made the trip up there and spent the weekend riding. Currently, there are about 15 miles of trail. Due to their layout as a combination of loops and bi-directional trails, you can end up doing a ride of 23 miles with minimal riding of sections in both directions. Fortunately, these sections turn out to be some of the best parts!

BCSP is an interesting study in that the Hoosier Mountain Bike Association built them using a hybrid method with both paid and volunteer labor. A lot of the trails appear to have been cut with a machine, and the hardest bits, including some major benchcutting and rockwork-- of which there was a lot of, were done by hand.

If you've never been to this part of Indiana, you might be surprised by the terrain. While not having anything really high, it was in many ways similar to Matson Hill. In fact, we got some ideas that we hope can be incorporated into the new trails that will be built at Matson in the coming years.

Probably the most interesting things for me were the way the designers made use of the constantly undulating terrain, and how they used rock work to armor areas that were potential spots for sustainability problems, which at the same time also enhanced the fun factor of the trail. There were several curves through drainages that were armored with flat rocks tilted at angles which created berms that allowed a rider to just rail through it with minimal, if any braking. Several bermed climbing turns were so well done you hardly slowed down for climbing, and barely needed your brakes going down them.

Another highlight was the 2.1 mile climb up to Hesitation Point. Spreading around 300' of elevation gain over this distance made for a really enjoyable climb, in which you never really were at a flat spot, but constantly going up the whole time, but at such a grade that it almost never violated IMBA guidelines. There were several rock gardens on this climb, and they added some major fun to it, as well. It was even better going down!

The newest stuff there is more technical, and consists of fast, curvy trail interspersed with a lot of technical parts. They've constructed a lot of ramps and jumps out of rock along alternate lines on the main trail, so you've got your choice of what you can ride. The last mile or so of current trail is just fantastic. You just roll along a ridgeline, hardly having to pedal, swooping through drainages, hitting as many jumps as you can, until you reach the campground. It's enough to keep a smile on your face the whole day.

There's more construction going on, including a beginner loop near the North Trailhead, and an expert loop near the Southern one, so there's plenty of trail for everyone to ride. I would have included more pictures, but I hardly took any on this trip. I just didn't want to take the time to stop for any! Paraphrasing something Bob Crow said while we were there: "If you don't have fun on these trails, you probably ought to give up mountain biking."

Creve Coeur/Bangert Island Mini Epic




After driving all the way to Durango and back, I was looking for a ride that didn't involve much driving. The closest trail to me turns out to be at Creve Coeur Park, and I hadn't been there since the workday in the Spring. Now that Bangert Island is above water, and clear, I figured, why not ride both of them?

We started at Creve Coeur and rode that. Brian, Glenn and others have done a nice job getting the rest of the section open to ride after the small turnout at the workday. What's there now is about a mile of twisty, fun singletrack with lots of switchbacks, turns and drainage crossings. After the Fall workdays, there will be around 3.5 miles of singletrack there!

Next, we headed down the steep gravel road by the Corporate Picnic site, and rode down to the lake. Went around the lake, over to the bike path that leads across the Page Avenue Extension to the Katy, and took the Katy to Bangert Island.

This was my first time at Bangert. Knowing only that it was an island that is sometimes underwater, or cut off from the mainland, I didn't really know what to expect. Surprisingly, there was more variation in the terrain than I expected. Don't get me wrong, it was only a few feet here and there, but it's enough to have allowed the designers to give the trail some flow throughout most of its length, rather than just being a flat ribbon as in the picture. Evidence of being underwater is also everywhere, with driftwood, and a layer of dried mud covering most things. Hats off to the GORC St. Charles County Crew for the fine addition of another 2.5 miles of singletrack to our area.

Then it was back on to the Katy to retrace our route. The ride ended up being about 25 miles; a mixture of dirt singletrack, pavement and the Katy. It was a different kind of ride than using the Katy to link Lost Valley, Matson, and Klondike, and a nice change of pace. I rode it on a cyclocross bike and pulled my son in a trailer except on the singletrack, when we traded off riding and babysitting, so you could pretty much ride these trails on any kind of bike you like, when they're dry.

No Monthly Meeting for August


There will not be a monthly meeting in August. Kirby the Grand Poobah, says you can still go to the Tap Room and drink beer with your friends if you like.

Monthly Meeting- Wed. June 4th 7pm


The regular monthly meeting will be at the Schlafly Tap Room. We'll probably discuss the new trail at Creve Coeur Park and other recent projects.

All Trails at Greensfelder Now Multi-Use


As of Monday, May 26th all trails at Greensfelder County Park are multi-use. It's more important than ever now to make sure you're up to speed on IMBA's Rules of the Trail, and practice good trail etiquette when encountering equestrians out there.
IMBA's website has an interesting article about bike/equestrian interaction.

I Am Spartacus



Tom Erb designed Spartacus several years ago to help with much of the rockwork at Klondike, but since we've been using it quite a bit as of late, I thought I'd mention it again.
This is a very clever device, made out of chains arranged in concentric circles, that lets you move heavy objects, usually rocks, when you don't have the luxury of bringing in heavy equipment. The rock is maneuvered onto Spartacus, and then up to 8 handles allow for a number of people, strong of back, weak of mind, to carry or drag it to the desired position.
The plans for building your own have been released under the Creative Commons license, or you can pay Tom to build one for you.

New Trail at Bangert Island


Mike Dunston and rest of the St. Charles County GORC Crew have been busy as usual. May 20th is the scheduled grand opening of a new 2.5 mile trail located near the intersection of I-70 and 5th Street. Here's a preliminary map to give you an idea of the location. We'll keep you updated as we get more details.

Creve Coeur Park Trail Update



Due to a very light turnout for the workday 2 weeks ago we were unable to open as much of the trail as hoped. Brian and Glenn, along with Drew Black, Aaron Coburn, and Eric Walter then went on their own time during the week and grubbed and raked the corridor connecting the 2 largest sections which had been cut. While only a relatively small section of trail is ridable, hopefully it will give you a taste of what's to come at this park. There may be another workday there this Spring, scheduled on short notice, so keep your eyes on the GORC Calendar.

This is going to be a fun place to ride. It's been described elsewhere as being like SIUE with climbing, so if that appeals to you, then please try to make an effort to come out, if not this Spring, then in the Fall.

Castlewood Maintenance Day- April 26th


As most of you probably know, the river bottom trails at Castlewood were under water for quite awhile. As a result Sam's plan for the maintenance day has changed:

The flooding has changed our plan from a half dozen small projects, to two small projects and a new one, clearing the river trails of the logs that floated in.

The plan:

1) One crew to do benching on the rollercoaster and armor one ditch.

2) One crew to modify the uppermost bridge on the 3%LoveMtRidge Trail.

3) I am hoping for four crews to do chain saw work on the river trails. I am putting out a call for Certified Sawyers to lead crews, and we need helpers to clear the logs.

Saturday, April 26th, 9am at the Rangers Office.
Lunch will be served.

As for the rest of it, I'm not quite sure. It sounded like Sam had been drinking a lot of wine, because he was sort of raving. Something about him, Kirby, and MikeD riding endless loops on a Pugsley to flatten everything back into place...

Midwest MTB Festival May 2-4 Reminder


This is a quick post to excite / ignite the upcoming 2wheeled fun-fest. I didn't make it last year but I'm looking forward to the '08 edition.

This is all taken from the official website...

Friday May 2nd, 2008
IMBA Advocacy Summit

8 am – 10 am – Registration open @ Five Points (pre-registrants only)
9 a.m. - 10:30 - Club Care with IMBA TCC
10:30 to 12pm - Plainfield Bike Park presentation
12pm to 1 pm - Lunch
1 p.m - 2:30 - Leadership Roundtable with Ryan Schutz from IMBA
3:30 - Group Ride at Farmdale
4 - 6pm - Registration booth open at Farmdale
7:30 pm - IMBA TCC night ride!!

Saturday May 3rd, 2008
8 am – 12pm – Registration OPEN – Farmdale Reservoir
9 am - vendors open
10 am - Group Rides!! Jubilee & Black Partridge Park
noon - beer sales open!
1 pm - live music!
1 pm - family hash hike
2 pm - Mud Maids Ladies Ride
3 pm - GAMES! stage area
4 pm - Raffle!
7:30 - Night Rides!
9:30 - Movies! - Radical Films - Kackle Factor!!

Sunday May 4th, 2008
10 am - Epic Ride!! Independence Park & Dirksen Park
5 pm - campground closes! Make sure you don’t get locked in!!


Farmdale Reservoir is the host site of this year's festival. It will be the main site of all the festivities, and camping is available. This park offers over 20 miles of tasty singletrack with a balanced mix between multi-use and hike/bike specific trails. It features tight twisty sections, fast open stretches, up-downs, creek crossings, a downhill course, stunt loop, and new mountain-X/dirt jump area.

Jubilee houses the largest single trail system in the area. Most of it is "doubletrack", and the park is frequented by both mountain bikers and equestrians. There is a area on the south side of the park with plenty of singletrack dedicated to hikers & bikers only. This park offers a bit of everything, from blazing fast downhills, gut wrenching climbs, easy flowing sections. Most of the trails are non-technical, but there is plenty for the intermediate rider on the singletrack.

Independence Trail offers 12+ miles of 100% sweet singletrack! It also offers some of the most challenging terrain in the area. Plenty of logs, creek crossings, up downs, and hill climbs. The system is one long loop, but has several outs for the meek of heart.

Creve Coeur County Park Workday- Saturday, April 19th 9 a.m.


The new trail is in blue at the bottom right.

Come and help build the first section of brand new singletrack at Creve Coeur County Park. There is currently 2-3 miles of trail flagged, approved, and ready to build, with more to come. The trail is rollercoaster-like dirt singletrack with a few climbs thrown in for good measure. The first phase consists of a loop connecting to an out-n-back. We'll begin building the out-n-back, and depending on turnout, attack the loop.

Momentum Cycles is supplying coffee and bagels in the
morning, and we'll have schwag from Sunset Cycles and O'Fallon Brewery.

Enter the Park on Streetcar Drive (off Dorsett Rd), follow the road past
the first baseball field and tennis courts, park in the large gravel
parking lot just past the tennis courts on the right. St. Louis County
Parks is providing lunch afterwards - bring gloves, water, work shoes,
and weather permitting, your bike.