Showing posts with label matson hill. Show all posts
Showing posts with label matson hill. Show all posts

Matson Map Update


The St. Charles GORC crew, and St. Charles County Parks never stop! They just keep adding more and more trail at Matson Hill. As a result of the spring workdays, another 0.6 miles of trail is ready for you to ride. Please respect the signs, and turn around and return by the same route, as requested. There are a couple of workdays scheduled for Matson in the fall, so if you want to see more trail like this, please volunteer.

Matson Hill Workday- Saturday, March 12th

New trail construction at Matson Hill continues this Sat. March 12th from 9am-1pm. We'll be working on the next phase which is shown in green on the map.
Sign up and details are available here.

Matson map updated


Well, it was a little slow in arriving, but the map of the new trail at Matson Hill is finally here! The best thing to report is the current distance of 4.9 miles, up from 2.8. There's a lot more to come, and Matson has 2 workdays scheduled for this year, so come out and help add even more trail. The pdf version of the map should be up on the GORC Trails page soon, and you will be able to find it here.

Matson Hill - June 5th Workday 9-1pm



When:
Saturday, June 5th, 2010. From 9:00~1:00.

What: We're having the last of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain bikers, hikers, and trail runners are all welcome, so don’t be bashful about showing up.

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Where:

From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
• Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through pilznr’s “What to expect at a workday” post, available via this link; http://gorctrails.com/board/topic.asp?TOPIC_ID=3711

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):
• The St. Charles County Park's (SCCP) office [636-949-7535],
• through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/
• or on this thread.

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.

Bring your bike or trail shoes if you want to try what you built after lunch.

NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.

Matson Hill Workday- Saturday, March 20th

When: Saturday, March 20th, 2010. From 9:00~1:00.

What: We're having the 1st of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain biker, hikers, and trail runners are all welcome, so don’t be bashful about showing up.

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Where:
From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
• Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through the “What to expect at a workday” post. Bring your bike or trail shoes if you want to try what you built after lunch.

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):
The St. Charles County Park's (SCCP) office [636-949-7535];  through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/; or on this thread.

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.

NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.

Matson Hill Workday- Sat. Dec. 19th


Craig at the new DeClue creek crossing completed at the Dec. 12th Greensfelder workday
When: Saturday, December 19th, 2009. From 9:00am-1:00pm.

What: We're having the last workday of the year at Matson Hill Park, and everyone is invited. 

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Directions: Please note that we are not parking at the main Matson Trailhead/parking lot.

From the Highway 40/94 interchange:
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. 

• You can also click this for a Google map link. Clicking the green bike will give you the “get directions” link. 

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through the article “What to expect at a workday”.

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):


GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch (menu still TBD, but rumored to be Bekin’s chicken chili).