GORC Water Bottles

Momentum Cycles now stocks water bottles with the ultra exclusive GORC logo emblazoned on them. Proceed at once to your local Momentum shop and pick up one, two or a dozen. Momentum has graciously offered to share $1 from the sale of each water bottle with GORC. So, you get to stay hydrated, Momentum get's your business and GORC get's your money to help build trail! Supplies are limited, so don't delay.


Cliff Cave Workday/Appreciation Party-- Saturday, Oct. 30th

When: Saturday October 30th
Where: Cliff Cave Park

Directions: From I-255 take Telegraph Rd. south 1.7 miles to Cliff Cave Rd.
Turn left onto Cliff Cave Rd. and continue 1 mile into park.

Details: We will meet at the pavilion. Start time is 9:00am and will work until 12:30 or so.

What to bring: Sturdy shoes, gloves, eye protection and something to drink. For a more detailed description, it's a good idea to read Pilznr's post at http://gorctrails.com/board/topic.asp?TOPIC_ID=3711

Please contact Sue Bell if you plan to attend.
314-615-8822 or e-mail sbell@stlouiscounty.com

Lunch will be provided by St. Louis County Parks, so please let Sue know if you are coming so she can plan for food.

Those that attend the workday will be rewarded with an opportunity to win an attendance prize provided by:
South County Cyclery and Olde Towne Fenton Cyclery, as well as Crusoe's Restaurant!

What we're doing: Cliff Cave Park has 2 trails Spring Valley and Bluff Trail.
We will be concentrating first on the Bluff Trail, we have 1/2 mile of new trail to build. This will eliminate several unsustainable sections and provide for a fun ride in both directions.
We also have several short re routes flagged on the Spring Valley loop. These will eliminate a couple short, non draining spots.
If attendance provides, we will put these in as well, so everyone come out and help!!

After the workday will be GORCs annual Appreciation Party!!!
Will have a ride, mother nature permitting.
More info on the message board.

Of Berryman and Men

The Berryman is amazing.

The Berryman is difficult.

The Berryman is slowly wasting away.

These statements are all true. They have been for 20+ years. While I do not want to write a small book on the trail I will, however, explain the benefits of having the Berryman Loop within 120 miles of your front door.

The Berryman Trail is a loop of singletrack in the Mark Twain National Forest that serves hikers, equestrians and within the last 30 years, mountain bikers. It was built by the Civilian Conservation Corp - CCC for short - which was instituted shortly after the Great Depression. The Berryman Trail is an approximately 24 mile loop that features over 2,400 feet of climbing, several creek crossings and the scaling of over 12 Ozark hillsides. The trail follows creek valleys, climbs ancient Ozark hills and descends into several rocky outcroppings.

The Berryman Trail was classified as an IMBA Epic in 2002. The trail best features the "feel" of Missouri backcountry trail riding. There are many reasons that bikers continue to ride the Berryman.

But there's one major draw… The Berryman Trail is a LOOP.

You can't say that about any other portion of the Ozark Trail network. The Berryman Trail may be the largest loop in Missouri that doesn't need other trail connectors or roads to call it a true loop.

And the best part that the original designers may or may not have grasped is that there are several legitimate bailout options. Options that allow injured or destroyed folks to limp back to their cars via the "central" firewood that pierces the trail's core. On top of that, there are two major trailheads that feature camping.

True, the Berryman is suffering every trail's worst nightmare. Continued use in the muddy season, motorized use (ATV/dirtbike) and fall-line climbs are contributing to its "erosion issues". All of these issues combined would absolutely murder an average trail. But for some reason the Berryman is losing its foothold much more slowly. Sure, the switchbacks in some areas are grossly eroded but then think, really think, of the sweet, glossy-buff sections of trail that thread through the pines or hug the edge of a precipice. In the dry season the Berryman rails but in the wet the trail leaves you for dead. But you shouldn't be riding it when it's wet, remember?

Ignoring the switchbacks that would be more accurately called slides that drop into the Brazil Creek campground and the areas that require riders to know how to loft their front end chin-high in spots, the Berryman isn't out to destroy you - it simply wants to make you a better Missouri Ozark trail rider. If you use the Berryman as your training ground then you will be almost unstoppable - except West Virginia.

Simply put, the mere FACT that you can link up the Ozark Trail (hundreds of miles!) and Council Bluff is unfathomable to other folks. Missouri has a trail network that other states would die for - and it's all about 120 miles from your kitchen sink.

Spread the word.

2010 Brown County Break Down - Pictorial

Lisa and I (Matt) decided to check out the Brown County Break Down after riding there multiple times and reading about the event. So on a whim we signed up and checked it out.

Here's a quick pictorial of the event. There aren't many photos because the trails are too fun to slow down and snap pics...

Everyone waiting to get started - about 500 riders

Near the homebase setup headquarters

Riders were staged based on distance (100/75/60/40/20 miles) and within the mileage by speed - fast, average, leisurely.

About to enter the first trail. On Saturday this parking lot was full of product demos from Scott, Trek, Cannondale and Giant.


Hesitation Point - at the top of the 2 mile climb then doesn't womp you on the way up. Very fun on the way down and where they hold their Super D races earlier in the year.

A small sampling of their trail armoring work. With 95% of Brown County's trail being dirt they take great care to ensure the singletrack doesn't erode or become a bog.

At the 40 mile end point - featuring live bluegrass music and food.


A view of the historic cabin and live band


If you ever find yourself wondering about Brown County State Park then check this out.

Annual GORC Appreciation Party


Get ready for the annual GORC Volunteer Appreciation party on October 30th! This year it will be held at Cliff Cave park following a much-needed workday. Cliff Cave offers a wealth of geological curiosities and oddities throughout the park that can be explored while on your mountain bike. Sinkholes, caves, bluffs overlooking the Mississippi, haunted demon hollows and car wreckage. All can be found in this twisty trail-laden park.

This edition of the volunteer appreciation party will feature a poker run. Yep. We are holding the party earlier this year instead of the traditional GORC birthday of December 12th when we typically freeze to death. We're hoping for great weather and a large turnout so we better see you October 30th. Bring candy, too, Matt says so.

Look for more details on the GORC website either on the message board or home page as the date nears. We would like to get a head count so be sure to post up on the board.

DON'T FORGET YOUR COSTUME -- it's halloween weekend after all!

St. Louis County Parks Trail Hotline

With last year's trail vandalism at the Chubb and now with the painful extraction of some monkeyheads at Greensfelder we at GORC felt it was high time to post the St. Louis County Parks Trail Hotline - 314-615-8911. Now we can all help police our favorite trails.

This hotline is for St. Louis County parks only. Parks include West Tyson (Chubb), Cliff Cave, Creve Coeur, Greensfelder and ALL of St. Louis County's parks.

If you encounter somebody destroying trail first-hand be sure to get involved by calling the hotline at 314-615-8911. Approach the individual if you feel comfortable and respectfully explain that he or she is wrecking the trail through their grooming actions.

Never start a confrontation and remember they probably think they are IMPROVING the trail. However, no matter the situation, always let the county parks staff know that this is occurring so they can better protect their valuable trails.

BERRYMAN Epic-alness

October 23rd, Berryman Epic, version 3.0

Look out for some great racing on some of the best backcountry Missouri trails with 200+ of your racing friends. The race is on Saturday so you can party down through the night, stumbling back to your campsite at the ever-so-friendly Bass River Resort.

Get ready for 56 miles of BEST EVER.

GORC will be assisting the organizers in preparing the course in the coming weeks by cutting out any deadfall and securing the route.

We will see you there!

BURNIN!

It's time for the 7th Annual Burnin' at the Bluff - this weekend. The classes are completely stacked this year and the weather outlook is absolutely killer. Several GORC members will be racing the 12 hour challenge around Council Bluff Lake and a few others will be PATROLLING the course to keep everyone safe. If you see a patroller out there let them know you appreciate their presence.

See everyone this weekend!!!!!

Lost Valley Workday- Saturday, October 2nd

We're going to do some well-needed maintenance at Lost Valley. Mostly Focusing on the trail we've built over the last two seasons. Just an effort to tune it up and remove/mitigate some minor problems we've experienced.

We'll need as many able bodies as we can get. Perhaps you think that maintenance workdays are not as sexy as building new trail, but this work is really needed and will help the trail immensely.

The Specifics:

When: Saturday Oct 2nd
9am - 1pm (please arrive by 8:45 or so in order to "shuttle" in to the work site)

Where: Lost Valley "Upper Parking lot" aka The Mound, ~2miles south of hwy 40 on hwy 94 just around the bend from the High School.

Details: Bring: Water, gloves, sturdy shoes, dress for the weather.
Expect: Enjoyable but strenuous work, camaraderie and good times.
We'll Ride after lunch too!! As always.

Misc... As always, FREE LUNCH, sponsored by the Missouri Department of Conservation will be provided after the work.

BONUS: Morning Coffee to be provided by the 2nd Street Bike Stop and Cafe

Sign-up and more info can be found on the message board.

Greensfelder Workday-- Saturday, Sept. 25th 9am-1pm



We're going to do some maintenance work on the Eagle Valley singletrack, and try to complete one of the two switchbacks on the DeClue extension. Don't know where the singletrack is on Eagle Valley? Come and help out this Saturday, and you can find out.

If we can get the trail in good enough shape this fall, we can start working on a connector from the current end of the DeClue singletrack at Scenic Loop Rd. down to the junction with Eagle Valley on the valley floor(a potential route is shown in orange on the map). This will complete a loop of somewhere around 9 miles that will be ~ 99% singletrack, and ridable in both directions.

There will be fewer St. Louis County Parks volunteers than usual at this workday, so we really need a good turnout from GORC volunteers. You can find sign up, and find out more info on the message board.

Take A Kid Mountain Biking Day


Once again, GORC is teaming up with St. Charles County Parks to host Take A Kid Mountain Biking Day. This years event will be held at Frontier Park in St. Charles, and on the trails at Bangert Island on Oct. 9th, beginning at 10am. You can volunteer, or find out more information on the GORC message board.

Hazel Creek out n'(barely) back

Big Jim Mac and I seized a weekday opportunity to beat the crowds on the OT Curtois section earlier this week. The impromptu "plan" was to explore south from Berryman base camp down to Hazel Creek camp (if possible) for an out n' back trip of about 26 or 27 miles...
...ambitious, no?
The temps were moderate in the low 80's but the humidity was quite high. "High" as in it-started-raining-by-the-end, which made a not insignificant contribution to the overall epic-ness of the ride.

The section from Berryman down to highway 8 was generally similar to the hillier sections of Berryman proper including some babyheads, roots, pea-sized gravel, pine trees, and cool hillside rock formations. The Lost Creek crossing made for a good foot soaking and the sandy run after really put the grindies to our drivetrains. After that the trail generally climbs and descends some cool Ozark topography with a nice variety of lowland riding in lush valleys, and singletrack laced along the hillsides. There were some trees down here and there that killed the flow a little but we removed as many as possible (we were just going to have to ride over them again on the way back anyhow). Jim also spotted some flagging that looked like a re-route or two were in the works for some short steep and/or eroded sections.

In general, the trail surface itself had more duff and organic material on it than most of the trails that get heavier bike traffic but it was all quite rideable, just a bit slower and softer. Many of the hollows and north-facing slopes had awesome moss-covered rock outcrops and ferns lining the trail.

Progress was pretty slow overall, mostly because I was having persistent front tire trouble. I even violated one of basic mountain biking's more simple tenets: thou shalt always check thine tyre for offending objects before installing a new tube... lest ye pop it straight away. It was looking like it was going to be a pretty long ride either way so we turned around at Snapps Branch, about 2 miles shy of our original destination (not to mention one moderate hill + one huge hill, both to be repeated after reversing at Hazel Creek). It's a neat little stream that trickles over a nearly uniform rock surface.

Horses had been through the few miles leading to and from our turnaround spot and the chewed up trail surface made for some more slow going. It was kind of a bummer that I'd slowed us up so much that we fell short of the campground we were both curious to see, but it does leave me with an additional reason to make the drive to ride the rest of that OT section in the future. And even with a popped air mat, a headlamp that croaked in the night, a rainfly that self destructed into a sticky silicone mess, a dented downtube, multiple flats, grindy drivetrains, leg cramps, falling completely over into some manky sludge puddle, and rain on the ride back... I would definitely head back to get some more OT.

Creve Coeur Workday-- Sat., Sept. 18th, 9am-1pm


The Fall workday season kicks off this Saturday on the Bootlegger's Run Trail, at Creve Coeur Park. It wasn't so long ago that this trail didn't even exist, and now there are 3.25 miles of singletrack right in the middle of everything.

Come out and help do some maintenance to ensure that the trail remains in great shape for years to come. Details and sign-up are on the message board.

Fall/Early Winter 2010 Workday Schedule


September is here already and so is the workday season. With a mix of maintenance, and new trail construction there's a lot to be done, so mark your calendar. More information on each workday can be found here as the date approaches.

Sept 18 Creve Coeur Park
Sept 25 Greensfelder Park

Oct 2 Lost Valley
Oct 16 Chubb
Oct 17 North Trace Sawyer Run
Oct 30 Cliff Cave | Appreciation Party

Nov 6 Greensfelder Park
Nov 13 SIUE (Southern Illinois University – Edwardsville)
Nov 20 Rock Hollow

Dec 4 Matson Hill Park
Dec 11 Matson Hill Park

Time Lapse on the Continental Divide


In this case the time lapse is 5 years, which is the difference between when these two photos were taken. The one on the top is from the top of Paywell Mtn. It was taken a few weeks ago, and it's looking north toward the western portal of the Alpine Tunnel.
The lower photo is looking south at Paywell Mtn. taken in 2005 from above the Alpine Tunnel, which sits squarely on the Continental Divide. You can see the turntable where the locomotives were turned around in the lower right. If you look really close, you can see Durango Doug standing right next to the turntable. I can't tell if he has his shirt on.

Matson map updated


Well, it was a little slow in arriving, but the map of the new trail at Matson Hill is finally here! The best thing to report is the current distance of 4.9 miles, up from 2.8. There's a lot more to come, and Matson has 2 workdays scheduled for this year, so come out and help add even more trail. The pdf version of the map should be up on the GORC Trails page soon, and you will be able to find it here.

Withered and melted on MiddleFork

I managed to convince a few foolhardy souls to make an attempt at an out-n-back of Middlefork on the 19th of July. The heat seemed like it might become an issue (heat indices well into the 100's F) but some extra measures were taken by the group to stave off instant death by dehydration or melting: electrolyte tabs, a water filter for refilling bottles and bladders, and I personally went for the full-on, double CamelBak maneuver...

The trail was in pretty good shape and its signature sustained benchcut downhills were as awesome as always. There was quite a bit of thorny veg to force your way through which made for some bloody raw arms and legs.

We hit Barton Fen and took a break... I think my tires were starting to smolder anyway. After refilling some bottles and plotting our next move, the smart guy in the group suggested perhaps a little turn-around-and-start-backing might be in order for safety's sake... because it was unbelievably hot and all. I'm not naming names, but his name starts with "C" and ends with "-raig"... And I'd probably be a dessicated pile of withered, leathery flesh on the side of the trail if I hadn't listened to his good sense.

Summary of Spring 2010 Work

"Car Door Loop" at Matson
More new singletrack at Matson

Another busy Spring. Our trail mileage was down due to the number of workdays that had to be devoted to maintenance. Next time you're out in marginal conditions trying to decide whether or not to ride, please remember that these maintenance days take away from building new trail. Here's a brief summary which lists the trail name, what type of work was done, the number of workdays, and the mileage of the sections worked on:




Cliff Cave - New Construction/Reroutes 1.5 workdays  0.5 miles
Matson Hill - New Construction/Reroutes 4 workdays 1.50 miles
SIUE - Maintenance/Reroutes 1 workday 0.10 miles
Castlewood - New Construction/Reroutes 2 workdays 0.40 miles
Chubb - Maintenance/Reroutes No official workdays 0.10 miles
Greensfelder - New Construction/Reroutes 2 workdays 1.0 miles
Creve Coeur - New Construction 2 workdays 1.0 miles

Matson Hill - June 5th Workday 9-1pm



When:
Saturday, June 5th, 2010. From 9:00~1:00.

What: We're having the last of four workdays this spring at Matson Hill Park, and everyone is invited. Mountain bikers, hikers, and trail runners are all welcome, so don’t be bashful about showing up.

This is the continuation of a multi-year project, and we hope to TRIPLE OR QUADRUPLE the current trail mileage at Matson by the time we’re finished.

Where:

From the Highway 40/94 interchange,
• Take Highway 94 South for 7.4 miles to F (turn right on F).
• Stay on F for 3 miles, then turn left on Stub Road. Follow Stub Road for ~.5 miles to gate, and follow directions from there. Or,
• Click this for a Google map link. Clicking the green bike will give you the “get directions” link. (For some reason, the last instruction just has you turning left off of F, without naming the road. That's Stub Road.)

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail. It’s also a good idea to read through pilznr’s “What to expect at a workday” post, available via this link; http://gorctrails.com/board/topic.asp?TOPIC_ID=3711

Why: To add more multi-use single track (natural surface) trail to the existing Matson loop. This is Phase One of a multi phase project, eventually utilizing 400+ acres of new Park property.

Please RSVP via ONE of the following (to make sure we bring enough food):
• The St. Charles County Park's (SCCP) office [636-949-7535],
• through the WebTrac registration system on the parks website, http://parks.sccmo.org/parks/
• or on this thread.

GORC & St. Charles County Parks will provide: Trail building tools, instructions on trail building, safety guidelines, and lunch.

Bring your bike or trail shoes if you want to try what you built after lunch.

NOTICE: In case of bad weather, please call the St. Charles County Parks (SCCP's) Trail Hotline (636-949-7475, option #2). SCCP's will only leave a message about the workday if it's cancelled.

Monthly Meeting for June- Canceled

The regular monthly meeting scheduled for June 2nd has been canceled. See you on July 7th.